Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of customer
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Keyword: |
CNC Machining Stainless Steel Parts |
Material: |
Aluminum,Plastic,Stainless Steel |
Finish: |
Anodizing, Plating, Brushing, Nickel, Polishing, Painting |
Application: |
Used Widely |
Process: |
Turning&Milling,turning CNC Parts |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
Keyword: |
CNC Machining Stainless Steel Parts |
Material: |
Aluminum,Plastic,Stainless Steel |
Finish: |
Anodizing, Plating, Brushing, Nickel, Polishing, Painting |
Application: |
Used Widely |
Process: |
Turning&Milling,turning CNC Parts |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
Machined CNC Stainless Steel Spare Parts, Precision Stainless Steel Parts
Quick details:
1. Keyword: CNC Stainless Steel Pin
2. Process: CNC Machining
3. Color: As per your requirement
4. Place of Origin: Guangdong, China
5. Application: Widely used
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Lead time: 1-2 weeks
Specification:
Material | Stainless Steel |
Application | Widely used |
Color | Silvery |
Package | Carton Box |
Surface treatment | Bushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc. |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ
1. Where is your factory?
We are located in Shenzhen, China.
2. How can I get a quote?
Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity, and surface treatment information.
3. Can I get a quote without drawings?
Sure, we appreciate receiving your samples, pictures, or drafts with detailed dimensions for an accurate quotation.
4. What’s the leading time?
It depends on quantity, generally, 1-2 weeks for samples, and 3-4 weeks for mass production.
5. Why should you buy from us, not from other suppliers?
With more than 15 years of experience in precision machining, we have a team of professional engineers to help customers complete designs and products