Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of custome
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Keyword: |
CNC Stainless Steel Accessories Taper |
Material: |
Stainless Steel,Aluminum, Etc |
Application: |
Auto,Electrical,Industrial Machine Equipment |
Surface Treat: |
Powder Coating |
Color: |
OEM |
Cnc Machining Or Not: |
CNC Machining |
Keyword: |
CNC Stainless Steel Accessories Taper |
Material: |
Stainless Steel,Aluminum, Etc |
Application: |
Auto,Electrical,Industrial Machine Equipment |
Surface Treat: |
Powder Coating |
Color: |
OEM |
Cnc Machining Or Not: |
CNC Machining |
CNC Aluminum Parts, Black, Machined Stainless Steel Accessories, Radiator
Quick details:
1. Keyword: CNC Stainless Steel parts
2. Process: CNC Machining
3. Color: Customized Colors
4. Place of Origin: Shenzhen city, Guangdong Province, China
5. Application: Widely used
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Packing: Carbon box
9. Lead time: 7-15days
Specification:
Material | Stainless Steel |
Application | Widely used |
Color | Custom Accepted |
Package | Carton Box |
Surface treatment | Bushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc. |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 7-15 days |
FAQ:
1. Where is your factory?
We are located in Shenzhen, China.
2. What quotation do you need to provide?
Please send us the drawings or samples of your products. The following details shall be included: drawings/quantities/materials/other requirements
3. How about the packaging?
Available as standard or customized.
4. If you benefit, will my drawings be disclosed?
No, we pay great attention to protecting the privacy of customers' drawings. If necessary, we can also sign NDA.
5. What is the lead time of mass production?
Frankly speaking, it depends on the order quantity. If you don't need tools, it usually takes 7-15 days after your deposit