Send Message
Shenzhen Perfect Precision Product Co., Ltd. 86-189-26459278 lyn@7-swords.com
Cnc Lathe Turning Machining Metal Stainless Steel Aluminum Parts Laser Cut Service Sheet Metal Fabricating

Cnc Lathe Turning Machining Metal Stainless Steel Aluminum Parts Laser Cut Service Sheet Metal Fabricating

  • Keyword
    CNC Aluminum Accessories Taper
  • Material
    Aluminum, Etc
  • Application
    Auto,Electrical,Industrial Machine Equipment
  • Surface Treat
    Powder Coating
  • Color
    OEM
  • Cnc Machining Or Not
    CNC Machining
  • Place of Origin
    Guangdong, China
  • Brand Name
    PFT
  • Certification
    ISO9001:2015, ISO13485:2016
  • Model Number
    OEM
  • Minimum Order Quantity
    1PC
  • Price
    Negotiable
  • Packaging Details
    As the requirement of custome
  • Delivery Time
    7-15 work days
  • Payment Terms
    L/C, D/A, D/P, T/T, Western Union, MoneyGram
  • Supply Ability
    10000Pcs/ Month

Cnc Lathe Turning Machining Metal Stainless Steel Aluminum Parts Laser Cut Service Sheet Metal Fabricating

achined CNC precision Stainless Steel parts
Quick Details:
1. Keywords: CNC stainless steel parts
2. Process: CNC processing
3. Color: according to your requirements
4. Origin: Guangdong, China
5. Use: widely used
6. Drawing format: 2D/(PDF/CAD) 3D (IGES/STEP)
7. Equipment: CNC machining center
8. Delivery period: 1-2 weeks

Cnc Lathe Turning Machining Metal Stainless Steel Aluminum Parts Laser Cut Service Sheet Metal Fabricating 0

Specification:

Material Stainless Steel
Application Racing accessories
Color As your requirement
Package Carton Box
Surface treatment Black Anodizing, Knurling
Drawing format 2D/(PDF/CAD),3D(IGES/STEP)
Certificates ISO9001:2015/ISO13485:2016
Lead time 1-2 weeks

Cnc Lathe Turning Machining Metal Stainless Steel Aluminum Parts Laser Cut Service Sheet Metal Fabricating 1

FAQ

1. Where is your factory?

We are located in Shenzhen, China.

2.Do you provide samples?

Yes, just need sample cost, we will return it back in mass production.

3.Do you received OEM/ODM?

Yes, we have more than ten years OEM experience.

4.What’s the leading time?

It depends on quantity, generally, 1-2 weeks for samples, 3-4 weeks for mass production.

5.Do you have design capabilities?

Yes, we would be delighted to help in the design of your parts. Please contact us as early as possible in the design process.