logo
Shenzhen Perfect Precision Product Co., Ltd.
products
products
Home > products > CNC Turning Milling Parts > Secondary Operations Management for Finished Parts

Secondary Operations Management for Finished Parts

Product Details

Brand Name: PFT

Certification: ISO9001,AS9100D,ISO13485,ISO45001,IATF16949,ISO14001,RoHS,CE etc.

Model Number: OEM

Payment & Shipping Terms

Minimum Order Quantity: 1PCS

Price: 0.19

Delivery Time: 5-8Day

Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram

Get Best Price
Highlight:
Lead Time:
3-7 Days For Samples, 10-20 Days For Mass Production
Dimension:
Customized
Oem/Odm:
Available
Shipping:
By Sea, Air Or Express Delivery
Surface Roughness:
Ra0.8-Ra3.2
Tolerance:
±0.01mm
Keyword:
CNC Machining Parts
Port:
Shenzhen
Design Software:
CAD UG CAM,STP,Solidworks And So On
Shipping Cost:
To Be Negotiated
Material Capabilities:
Steel, Steel Alloys, 11SMn30, Y15
Equipment:
3/4/5 Axis Center Machining
Shape:
Reducing
Size:
Customized
Application:
Automotive, Electronics, Medical, Aerospace, Etc.
Lead Time:
3-7 Days For Samples, 10-20 Days For Mass Production
Dimension:
Customized
Oem/Odm:
Available
Shipping:
By Sea, Air Or Express Delivery
Surface Roughness:
Ra0.8-Ra3.2
Tolerance:
±0.01mm
Keyword:
CNC Machining Parts
Port:
Shenzhen
Design Software:
CAD UG CAM,STP,Solidworks And So On
Shipping Cost:
To Be Negotiated
Material Capabilities:
Steel, Steel Alloys, 11SMn30, Y15
Equipment:
3/4/5 Axis Center Machining
Shape:
Reducing
Size:
Customized
Application:
Automotive, Electronics, Medical, Aerospace, Etc.
Secondary Operations Management for Finished Parts

What Exactly Is “Secondary Operations Management”?

Secondary operations are all value-adding steps after the last CNC cut:

  • Deburring & edge radiusing

  • Heat-treat (vacuum, induction, T6)

  • Surface finishing (anodize, passivate, DLC)

  • Laser marking & serialization

  • Light assembly (helicoils, O-rings)

⚠️ Without structured management, shops end up chasing parts across the floor and losing traceability.


Why Most Shops Struggle (Real Data From 34 Suppliers)

Benchmark Study (Q1–2025, 34 suppliers):

Pain Point % of Suppliers Typical Cost Impact
Lost traceability 79% Rework ≈ $4,800 per job
Heat-treat distortion 61% Scrap ≈ $3,200 per job
Wrong packaging spec 44% Customer return ≈ 8% of lots