Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of customer
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Keyword: |
Custom Sheet Metal Fabrication Parts |
Material: |
Stainless Steel,Aluminum |
Size: |
OEM |
Surface Treatment: |
Powder Coating |
Process: |
Bending |
Application: |
Mechanical Handle |
Keyword: |
Custom Sheet Metal Fabrication Parts |
Material: |
Stainless Steel,Aluminum |
Size: |
OEM |
Surface Treatment: |
Powder Coating |
Process: |
Bending |
Application: |
Mechanical Handle |
Custom Pink Parts, Precision Bending Accessories, High Quality Clip
Quick details:
1. Keyword: Sheet Metal Parts
2. Process: Sheet Metal Fabrication
3. Color: Any
4. Place of Origin: Guangdong, China
5. Application: Any
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Lead time: 1-2 weeks
Specification:
Material | Aluminum |
Application | Any |
Color | OEM |
Package | Carton Box |
Surface treatment | Testure/Sand/MT/YS/SPI/VDI |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ
1. Where is your factory?
We are located in Shenzhen, China.
2.What do you need to provide a quote?
Please kindly send us the drawings or samples of your product. Details below should be included:Drawings/Quantity/Material/Other Requirements
3.How about the packing?
Standard or customized will both be available.
4.Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers’ privacy of drawings, signing NDA is also accepted if need.
5.What about the leading time for mass production?
Frankly, it depends on the order quantity,and it is common about 7 days to 15 days after your deposit if no tooling needed.