Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of customer
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Keyword: |
CNC Aluminum Parts |
Material: |
Aluminum |
Finish: |
Anodizing, Plating, Brushing, Nickel, Polishing, Painting |
Application: |
Used Widely |
Process: |
Turning&Milling,turning CNC Parts |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
Keyword: |
CNC Aluminum Parts |
Material: |
Aluminum |
Finish: |
Anodizing, Plating, Brushing, Nickel, Polishing, Painting |
Application: |
Used Widely |
Process: |
Turning&Milling,turning CNC Parts |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
Machined Precision CNC Aluminum Plate, Mirror Polishing Accessories
Quick details:
1. Keyword: CNC Aluminum Plate
2. Process: CNC Machining
3. Color: Silvery
4. Place of Origin: Guangdong, China
5. Application: Widely used
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Lead time: 1-2 weeks
Specification of CNC Machining Parts
Product | CNC machining parts |
Material | Aluminum 6061,6063,7075 or OEM |
Size | Customized according to your drawing |
Samples | sample available |
Tolerance | +/-0.01mm to +/-0.005mm |
Logo | custom logo available |
Surface treatment | *Polishing*Anodizing*Sand blasting |
Color | silver,black,gold,red,green,blue,purple,etc... |
Services | OEM & ODM & Design & Assemble Services |
Quality System | ISO9001:2015 |
FAQ
1. Where is your factory?
We are located in Shenzhen, China.
2.What do you need to provide a quote?
Please kindly send us the drawings or samples of your product. Details below should be included:Drawings/Quantity/Material/Other Requirements
3.How about the packing?
Standard or customized will both be available.
4.How will you deliver my goods to me?
We offer as many shipping options as possible, such as DHL, UPS, FedEx, TNT, EMS to enable our customers receive their goods rapidly at door. We also ship by economic method.
such as air cargo and sea cargo, Direct line, Air Mail according to clients' request.
5.What about the leading time for mass production?
Frankly, it depends on the order quantity,and it is common about 7 days to 15 days after your deposit if no tooling needed.