Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of custome
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Type: |
CNC Plastic Parts |
Cnc Machining Or Not: |
CNC Machining |
Micro Machining Or Not: |
Micro Machining |
Material: |
Aluminum,Copper,Stainless Steel,Plastic |
Tolerance: |
0.01-0.05mm Or Customized |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
Type: |
CNC Plastic Parts |
Cnc Machining Or Not: |
CNC Machining |
Micro Machining Or Not: |
Micro Machining |
Material: |
Aluminum,Copper,Stainless Steel,Plastic |
Tolerance: |
0.01-0.05mm Or Customized |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
Precision injection molded parts, ABS accessories,
Quick Details:
1. Keywords: injection molded parts
2. Process: injection molding
3. Color: black
4. Origin: Guangdong, China
5. Use: widely used
6. Drawing format: 2D/(PDF/CAD) 3D (IGES/STEP)
7. Equipment: CNC machining center
8. Delivery period: 1-2 weeks
Specification:
Material | ABS PP |
Application | Widely used |
Color | red |
Package | Carton Box |
Surface treatment | Testure/Sand/MT/YS/SPI/VDI |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ:
Q1: What is the standard length of your profile?
A: The standard length of the profile is 6020mm, and we can cut it into a specific length to meet your project needs.
Q2: What is your minimum order quantity?
A: We do not have the minimum order quantity for new customers. We accept small orders to support your trial orders, new designs and market
development.
Q3: Can you provide free samples?
A: Yes, we can provide free samples, but if you do not have an international express account, we would prefer to charge the freight.
Q4: What is the delivery date for small orders and mass production?
A: Small orders take 1~3 working days, and mass production of materials takes 3~15 working days. The final delivery date shall be subject to each invoice.
Q5: What certificate do you have?
A: We have an ISO 9001 certificate.
Q6 What kind of deep process can you do?
A: CNC, drilling, milling, cutting, welding, bending, assembly.