Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of customer
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Keyword: |
CNC Aluminum Parts |
Color: |
Silver |
Cnc Machining Or Not: |
CNC Machining |
Material: |
Aluminum |
Application: |
Sports Equipment |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
Keyword: |
CNC Aluminum Parts |
Color: |
Silver |
Cnc Machining Or Not: |
CNC Machining |
Material: |
Aluminum |
Application: |
Sports Equipment |
Drawing Format: |
PDF/DWG/IGS/STP/ Etc |
High Precision CNC Steel Parts, Machined Turn-Mill Compound Parts
Quick details:
1. Keyword: CNC Steel Parts
2. Process: CNC Machining
3. Color: As your requirement
4. Place of Origin: Guangdong, China
5. Application: Auto Part, Metal Pipe
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Lead time: 1-2 weeks
Specification:
Material | Stainless Steel |
Application | Widely used |
Color | As your requirement |
Package | Carton Box |
Surface treatment | Bushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc. |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ:
Q1. Are you a manufacturer or a trading company?
We are factories.
Q2. How to get a quotation?
A2. Please provide 2D and 3D drawings, recommended quantity, surface treatment, finish and special requirements; We will quote within 1 or 2 days after receiving the details.
Q3. If I don't have drawings, how can I get a quotation?
A3. You can send us the samples, and we will scan and draw 2D and 3D drawings for your inspection.
Q4. How do you guarantee quality?
A4. Our production will strictly comply with the drawing requirements. We provide detailed photos for your confirmation before shipment. Any quality problems may require rework of parts at no additional cost.
Q5: Will it be safe after we get our drawings?
A5. Yes, we can sign a confidentiality agreement before receiving the drawings.