Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of customer
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Keyword: |
CNC Aluminum Accessories |
Material: |
Aluminum |
Color: |
Black |
Application: |
Auto,Electrical,Industrial Machine Equipment |
Surface Treatment: |
Anodized,Sandblasting,Anodizing,Plating,electroplating |
Service: |
Cnc Machining Service,customization |
Keyword: |
CNC Aluminum Accessories |
Material: |
Aluminum |
Color: |
Black |
Application: |
Auto,Electrical,Industrial Machine Equipment |
Surface Treatment: |
Anodized,Sandblasting,Anodizing,Plating,electroplating |
Service: |
Cnc Machining Service,customization |
Aluminum Parts, Laser Engraving Accessories, Machined Aluminum Parts
Quick details:
1. Keyword: CNC Aluminum Parts
2. Process: CNC Machining
3. Color: As your requirement
4. Place of Origin: Guangdong, China
5. Application: Widely used
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Lead time: 1-2 weeks
Specification:
Material | Aluminum |
Application | Widely used |
Color | Custom Accepted |
Package | Carton Box |
Surface treatment | Bushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc. |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 7-15 days |
FAQ
1. Where is your factory?
We are located in Shenzhen, China.
2.Is your organization committed to the concept of total quality management?
Yes, no matter in laser cutting, bending, or CNC machining, the workers will conduct the first sample inspection and random inspection during the processing to ensure the quality of the products.
3.How about the packing?
Standard or customized will both be available.
4.What’s the leading time?
It depends on quantity, generally, 1-2 weeks for samples, 3-4 weeks for mass production.