Product Details
Place of Origin: Guangdong, China
Brand Name: PFT
Certification: ISO9001:2015, ISO13485:2016
Model Number: OEM
Payment & Shipping Terms
Minimum Order Quantity: 1PC
Price: Negotiable
Packaging Details: As the requirement of customer
Delivery Time: 7-15 work days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 10000Pcs/ Month
Keyword: |
CNC Aluminum Parts |
Material: |
Aluminum |
Application: |
Used Widely |
Finish: |
Anodizing, Plating, Brushing, Nickel, Polishing, Painting |
Color: |
Black |
Keyword: |
CNC Aluminum Parts |
Material: |
Aluminum |
Application: |
Used Widely |
Finish: |
Anodizing, Plating, Brushing, Nickel, Polishing, Painting |
Color: |
Black |
CNC Machined Parts, Bright Black Anodizing, Precision Aluminum Parts
Quick details:
1. Keyword: CNC Aluminum parts
2. Process: CNC Machining
3. Color: Customized Colors
4. Place of Origin: Guangdong, China
5. Application: Widely used
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Packing: Carbon box
9. Lead time: 7-15days
Description:
Our company was growing up rapidly with our clients together, with our rich experiences and excellent quality.
Our wide range of services is capable of developing your product. We utilize the leaders of the industry to make your projects possible. We invite all types of inquiries and requests for quotation, we stand behind the quality of the stainless steel CNC bending parts and pride ourselves in being the best solution to your manufacturing needs.
Specification:
Material | Aluminum |
Application | Widely used |
Color | Custom Accepted |
Package | Carton Box |
Surface treatment | Bushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc. |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 7-15 days |
FAQ
1. Where is your factory?
We are located in Shenzhen, China.
2. Do you provide samples?
Yes, just need the sample cost, and we will return it back in mass production.
3. What about the quality of your product?
Our methods of tooling will produce the same or better quality than all other methods of fabrication.
4. What’s the leading time?
It depends on quantity, generally, 1-2 weeks for samples, and 3-4 weeks for mass production.
5. Why should you buy from us, not from other suppliers?
With more than 15 years of experience in precision machining, we have a team of professional engineers to help customers complete designs and products.