Precision Bending Sheet Metal Parts, Laser Cutting, Silver Color
Quick details:
1. Keyword: Sheet Metal Parts
2. Process: Sheet Metal Fabrication
3. Color: Any
4. Place of Origin: Guangdong, China
5. Application: Accessories
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Lead time: 1-2 weeks
Description:
Shenzhen Perfect Precision Product Co., Ltd was established in 2012 and now has a large facility with covering an area of 3000-5000 square meters in Shenzhen. A preferred business partner providing OEM and ONE-STOP service of metal stamping parts and CNC Machining parts for 10 Years.
7 Swords is able to meet customers’ requirements for all kinds of metal parts made out of stainless steel, carbon steel, aluminum, brass, copper, bronze and etc., which are based on customers’ drawings or original samples.
As a professional supplier, 7 Swords strives to keep the principles of Integrity, Quality, and Competitive Prices all the time.
The professional technical team and sales team are ready for your projects at any time. Their highly efficient response and full service make perfect drawing design, quotation, sample checking, production, delivery, shipping, and after-sales service for customers.
Specification:
Material | Stainless Steel |
Application | Accessories |
Color |
Any |
Package | Carton Box |
Surface treatment | Testure/Sand/MT/YS/SPI/VDI |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ
1. You have no 3D drawing, how should I start the new project?
Samples or an idea or a sketch will be good too, my engineering department can design the 3D drawing on the new project.
2. Where is your factory and how can I visit it?
Our factory is located in Shenzhen city and you can get more detailed information by browsing our website: http://www.7-swords.com or by Visiting us in person.
3. Why choose 7 Swords?
As an excellent supplier profit/ Assurance for you:
1) 100% Product quality protection
2) 100% On-time shipment protection
3) 100% Payment protection
4) 100% inspection before shipment
5) Much received popular "machining parts" factory
Our products profit for you:
1) Mix color designs for your winning market
2) More than 10 years manufacture for hydraulic spare parts
3) More than 10+ years of export experience
4) All products passed ISO9001 and ISO13485
5) One-stop service experience of more than 10+ years
4. What about the leading time for mass production?
Frankly, it depends on the order quantity, and it is common about 7 days to 15 days after your deposit if no tooling is needed.